Combined Cycle Power Plant Equipment
Supply of critical pressure vessels and heat recovery steam generators for combined cycle power plant.
Client
EWEC
Location
Abu Dhabi, UAE
Year & Duration
2024
Project Value
$28M
Project Overview
Major supply contract for EWEC's new combined cycle power plant, providing heat recovery steam generators (HRSGs), pressure vessels, and heat exchangers. The project contributes to the UAE's clean energy transition goals.
Team Size
Category
Project Gallery
Project Scope
- HRSG manufacturing and assembly
- High-pressure drum fabrication
- Heat exchanger production
- Quality assurance and testing
- Delivery and installation support
Key Deliverables
- 3 complete HRSG units
- 18 high-pressure drums
- Multiple heat exchanger assemblies
- Comprehensive test documentation
- As-built drawings and manuals
Challenges
- Meeting stringent power generation efficiency requirements
- Coordinating with turbine manufacturer specifications
- Managing large-scale equipment transportation
- Ensuring rapid heat-up and cool-down capabilities
Solutions
- Close collaboration with OEM engineering teams
- Advanced finite element analysis for thermal cycling
- Specialized heavy-lift transportation planning
- Material selection optimized for thermal performance
Key Achievements
All equipment passed factory acceptance tests on first attempt
Currently 15% ahead of schedule
Zero quality non-conformances to date
Commendation from ADNOC for quality excellence